Seventh Avenue West Corridor

Share Seventh Avenue West Corridor on Facebook Share Seventh Avenue West Corridor on Twitter Share Seventh Avenue West Corridor on Linkedin Email Seventh Avenue West Corridor link

Project Update, October 3, 2024: The results are in! Thank you to everyone for sharing your thoughts on the proposed designs for the Year One Routes. Click here to read the report!

Staff will be analyzing the feedback from the community to complete the designs for the Seventh Avenue West corridor. Stay tuned for more updates!



Improvements to Seventh Avenue are planned between 10th Street and the existing BC Parkway between 21st and 22nd streets.

This 2.6 km corridor provides access to Moody Park, Lord Kelvin Elementary School, shops and services on 12th Street, Grimston Park, 22nd Street SkyTrain Station, and the BC Parkway. The corridor also connects to the Queensborough Bridge and the pedestrian and cycling overpass across Stewardson Way and is part of TransLink’s Major Bikeway Network.

The proposed improvements for this corridor will build on the existing measures to slow down traffic and make it safer and more comfortable for people of all ages and abilities to walk and cycle.


Proposed Improvements

(Click on the images below to view a larger version)

1. Local Street Bikeway from 10th-20th streets: Bicycles share the roadway with vehicles

  • Traffic calming:
    • Speed humps
      • Curb extensions











2. Protected bike lane from 20th Street to the BC Parkway:

  • Install quick-build, flexible delineator posts
  • 25 on-street parking spaces removed, including:
    • 24 on the north side of Seventh Avenue from 20th Street to 22nd Street
    • One co-op / shared parking space on the south side of Seventh Avenue by the new crosswalk in front of the SkyTrain station
  • New crosswalk at 21st Street with accessible ramps
  • Relocate crosswalk currently at station stair entrance, moving it west to the station accessible ramp entrance.




We want to hear from you!

We are gathering feedback from people who live, work and use active transportation networks along the 7th Street West corridor.How can you get involved?

  • Stop by and learn more about what’s happening from City staff and the design team.
    • Date: Thursday, May 30, 2024
    • Time: 2:30 – 6:00 pm
    • Location: Entrance to Moody Park, 7th Avenue at 10th Street
  • Review the project information and provide your feedback: Complete the survey (open until June 12, 2024)

Project Update, October 3, 2024: The results are in! Thank you to everyone for sharing your thoughts on the proposed designs for the Year One Routes. Click here to read the report!

Staff will be analyzing the feedback from the community to complete the designs for the Seventh Avenue West corridor. Stay tuned for more updates!



Improvements to Seventh Avenue are planned between 10th Street and the existing BC Parkway between 21st and 22nd streets.

This 2.6 km corridor provides access to Moody Park, Lord Kelvin Elementary School, shops and services on 12th Street, Grimston Park, 22nd Street SkyTrain Station, and the BC Parkway. The corridor also connects to the Queensborough Bridge and the pedestrian and cycling overpass across Stewardson Way and is part of TransLink’s Major Bikeway Network.

The proposed improvements for this corridor will build on the existing measures to slow down traffic and make it safer and more comfortable for people of all ages and abilities to walk and cycle.


Proposed Improvements

(Click on the images below to view a larger version)

1. Local Street Bikeway from 10th-20th streets: Bicycles share the roadway with vehicles

  • Traffic calming:
    • Speed humps
      • Curb extensions











2. Protected bike lane from 20th Street to the BC Parkway:

  • Install quick-build, flexible delineator posts
  • 25 on-street parking spaces removed, including:
    • 24 on the north side of Seventh Avenue from 20th Street to 22nd Street
    • One co-op / shared parking space on the south side of Seventh Avenue by the new crosswalk in front of the SkyTrain station
  • New crosswalk at 21st Street with accessible ramps
  • Relocate crosswalk currently at station stair entrance, moving it west to the station accessible ramp entrance.




We want to hear from you!

We are gathering feedback from people who live, work and use active transportation networks along the 7th Street West corridor.How can you get involved?

  • Stop by and learn more about what’s happening from City staff and the design team.
    • Date: Thursday, May 30, 2024
    • Time: 2:30 – 6:00 pm
    • Location: Entrance to Moody Park, 7th Avenue at 10th Street
  • Review the project information and provide your feedback: Complete the survey (open until June 12, 2024)

Question and Answer

Have a question about the Seventh Avenue West Corridor Improvements? Please add it here and press submit. We will aim to reply within 5 business days. Sometimes answers require information from multiple sources. If the answer is going to take longer, we will let you know. If we think your question may be of interest to others, we'll post your question and our response here. Thank you for taking the time to write to us!

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
Page last updated: 04 Oct 2024, 09:11 AM